3d & Concept Worlds
SWAV — DIGITAL GARMENT PROTOTYPING
From sketch to 3D to stitched reality.
Year :
2023
Industry :
Fashion
Client :
SWAV
Project Duration :
1 week



Role: 3D Garment Design • Digital Prototyping
Developed a garment from initial hand-drawn pattern sketch by designer through digital 3D prototyping to final physical production.
The project demonstrates a full design pipeline, using virtual simulation to test form, fit, and detailing before fabrication.
The 3D garment is also Metaverse ready







More Projects
3d & Concept Worlds
SWAV — DIGITAL GARMENT PROTOTYPING
From sketch to 3D to stitched reality.
Year :
2023
Industry :
Fashion
Client :
SWAV
Project Duration :
1 week



Role: 3D Garment Design • Digital Prototyping
Developed a garment from initial hand-drawn pattern sketch by designer through digital 3D prototyping to final physical production.
The project demonstrates a full design pipeline, using virtual simulation to test form, fit, and detailing before fabrication.
The 3D garment is also Metaverse ready







More Projects
3d & Concept Worlds
SWAV — DIGITAL GARMENT PROTOTYPING
From sketch to 3D to stitched reality.
Year :
2023
Industry :
Fashion
Client :
SWAV
Project Duration :
1 week



Role: 3D Garment Design • Digital Prototyping
Developed a garment from initial hand-drawn pattern sketch by designer through digital 3D prototyping to final physical production.
The project demonstrates a full design pipeline, using virtual simulation to test form, fit, and detailing before fabrication.
The 3D garment is also Metaverse ready












